---
title: "Clocaenog Forest Met Mast Refurbishment"
id: "981"
type: "post"
slug: "clocaenog-forest-met-mast-refurbishment"
published_at: "2020-09-30T12:55:52+00:00"
modified_at: "2025-04-29T09:53:04+00:00"
url: "https://dulas.org.uk/clocaenog-forest-met-mast-refurbishment/"
markdown_url: "https://dulas.org.uk/clocaenog-forest-met-mast-refurbishment.md"
excerpt: "[fusion_builder_container type=\"flex\" hundred_percent=\"no\" hundred_percent_height=\"no\" min_height_medium=\"\" min_height_small=\"\" min_height=\"\" hundred_percent_height_scroll=\"no\" align_content=\"stretch\" flex_align_items=\"flex-start\" flex_justify_content=\"flex-start\" flex_wrap_medium=\"\" flex_wrap_small=\"\" flex_wrap=\"wrap\" flex_column_spacing=\"20px\" hundred_percent_height_center_content=\"yes\" equal_height_columns=\"yes\" container_tag=\"div\" menu_anchor=\"\" hide_on_mobile=\"small-visibility,medium-visibility,large-visibility\" status=\"published\" publish_date=\"\" class=\"\" id=\"\" margin_top_medium=\"\" margin_bottom_medium=\"\" margin_top_small=\"\" margin_bottom_small=\"\" margin_top=\"0px\" margin_bottom=\"0px\" padding_top_medium=\"\" padding_right_medium=\"\" padding_bottom_medium=\"\" padding_left_medium=\"\" padding_top_small=\"\" padding_right_small=\"\" padding_bottom_small=\"\" padding_left_small=\"\" padding_top=\"\" padding_right=\"0px\"..."
taxonomy_category:
  - "Wind"
---

# Clocaenog Forest Met Mast Refurbishment

**Project Overview**

Dulas carry out a range of services for RWE npower renewables including instrument installation, met mast refurbishment and decommissioning of masts up to 80m. Dulas also provides services for offshore remote sensing system management. In 2008, RWE npower renewables was awarded the rights to seek planning permission to develop a wind farm in Clocaenog Forest in North Wales. The forest is located within one of seven areas (called Strategic Search Areas) set aside for the development of large-scale wind farms. Dulas installed a number of first class Vector anemometers on three masts in 2009 (meeting IEC61400-12-1 guidelines). We then undertook complete met mast refurbishment in 2012.

**Implementation**

Maintenance visits are conducted every 6 months to inspect the masts. This enables the client to continue to collect reliable and robust data for their campaign.

The high performance classification of the anemometers means that measurements are accurate in the actual wind conditions experienced in the field.

As instrument specialists, Dulas engineers also installed a number of other instruments. This included wind vanes and temperature sensors, aviation lights and bird diverters.

Clocaenog Forest Wind Farm will have an installed capacity of over 50MW. Data from masts installed by Dulas will contribute towards the IPC’s considerations and help RWE npower renewables to determine what kind of wind farm could be proposed for this site.

By [Dulas Group](https://dulas.org.uk/author/dulas/)
Published On: September 30, 2020

Share:

[https://www.facebook.com/sharer.php?u=https%3A%2F%2Fdulas.org.uk%2Fclocaenog-forest-met-mast-refurbishment%2F&t=Share%3A](https://www.facebook.com/sharer.php?u=https%3A%2F%2Fdulas.org.uk%2Fclocaenog-forest-met-mast-refurbishment%2F&t=Share%3A)
[https://x.com/intent/post?text=Share%3A&url=https%3A%2F%2Fdulas.org.uk%2Fclocaenog-forest-met-mast-refurbishment%2F](https://x.com/intent/post?text=Share%3A&url=https%3A%2F%2Fdulas.org.uk%2Fclocaenog-forest-met-mast-refurbishment%2F)
[https://www.linkedin.com/shareArticle?mini=true&url=https%3A%2F%2Fdulas.org.uk%2Fclocaenog-forest-met-mast-refurbishment%2F&title=Share%3A&summary=Project%20Overview%0D%0A%0D%0ADulas%20carry%20out%20a%20range%20of%20services%20for%20RWE%20npower%20renewables%20including%20instrument%20installation%2C%20met%20mast%20refurbishment%20and%20decommissioning%20of%20masts%20up%20to%2080m.%20Dulas%20also%20provides%20services%20for%20offshore%20remote%20sensing%20system%20management.%C2%A0In%202008%2C%20RWE%20npower%20renewables%20was%20awarded%20the%20rights%20to%20seek%20planning%20permission%20to%20develop%20a%20wind%20farm%20in%20Clocaenog%20Forest](https://www.linkedin.com/shareArticle?mini=true&url=https%3A%2F%2Fdulas.org.uk%2Fclocaenog-forest-met-mast-refurbishment%2F&title=Share%3A&summary=Project%20Overview%0D%0A%0D%0ADulas%20carry%20out%20a%20range%20of%20services%20for%20RWE%20npower%20renewables%20including%20instrument%20installation%2C%20met%20mast%20refurbishment%20and%20decommissioning%20of%20masts%20up%20to%2080m.%20Dulas%20also%20provides%20services%20for%20offshore%20remote%20sensing%20system%20management.%C2%A0In%202008%2C%20RWE%20npower%20renewables%20was%20awarded%20the%20rights%20to%20seek%20planning%20permission%20to%20develop%20a%20wind%20farm%20in%20Clocaenog%20Forest)
[https://api.whatsapp.com/send?text=https%3A%2F%2Fdulas.org.uk%2Fclocaenog-forest-met-mast-refurbishment%2F](https://api.whatsapp.com/send?text=https%3A%2F%2Fdulas.org.uk%2Fclocaenog-forest-met-mast-refurbishment%2F)
[mailto:?subject=Share%3A&body=https%3A%2F%2Fdulas.org.uk%2Fclocaenog-forest-met-mast-refurbishment%2F](mailto:?subject=Share%3A&body=https%3A%2F%2Fdulas.org.uk%2Fclocaenog-forest-met-mast-refurbishment%2F)

Dulas supports landmark wind farm planning in Wales

Dulas supports landmark wind farm planning in Wales

[Read more](https://dulas.org.uk/dulas-supports-landmark-wind-farm-planning-in-wales/)

From planning to decom: Wind monitoring at a site in Wales

From planning to decom: Wind monitoring at a site in Wales

[Read more](https://dulas.org.uk/from-planning-to-decom-wind-monitoring-at-a-site-in-wales/)

Dulas installs first-ever flux tower in the South of Scotland

Dulas installs first-ever flux tower in the South of Scotland

[Read more](https://dulas.org.uk/dulas-installs-first-ever-flux-tower-in-the-south-of-scotland/)

London Array Wind Farm Wind Monitoring Instrumentation

London Array Wind Farm Wind Monitoring Instrumentation

[Read more](https://dulas.org.uk/london-array-wind-farm-wind-monitoring-instrumentation/)

Y Bryn Wind Farm Met mast installation

Y Bryn Wind Farm Met mast installation

[Read more](https://dulas.org.uk/case-study-y-bryn-windfarm/)

Grayside Wind Farm LiDAR Installation

Grayside Wind Farm LiDAR Installation

[Read more](https://dulas.org.uk/case-study-grayside-wind-farm/)

Gordonbush Wind Farm Permanent WindCube Installation

Gordonbush Wind Farm Permanent WindCube Installation

[Read more](https://dulas.org.uk/case-study-gordonbush-wind-farm/)

Golticlay, Caithness – Mast refurbishment

Golticlay, Caithness – Mast refurbishment

[Read more](https://dulas.org.uk/golticlay-caithness-mast-refurbishment/)

Onshore wind feasibility

Onshore wind feasibility

[Read more](https://dulas.org.uk/onshore-wind-feasibility/)

Beinn Mhor and Rothmaise

Beinn Mhor and Rothmaise

[Read more](https://dulas.org.uk/beinn-mhor-and-rothmaise/)

Nant y Gelli Wind Turbine Feasibility Study and Planning Services

Nant y Gelli Wind Turbine Feasibility Study and Planning Services

[Read more](https://dulas.org.uk/nant-y-gelli-wind-turbine-feasibility-study-and-planning-services/)

Ty Nant Single Turbine Environmental Report and Planning application

Ty Nant Single Turbine Environmental Report and Planning application

[Read more](https://dulas.org.uk/ty-nant-single-engine-turbine-report/)
