title: "Glenmore Control Panel Refurbishment"
id: "1031"
type: "post"
slug: "glenmore-control-panel-refurbishment"
published_at: "2020-09-30T17:28:12+00:00"
modified_at: "2025-04-29T07:34:53+00:00"
url: "https://dulas.org.uk/glenmore-control-panel-refurbishment/"
markdown_url: "https://dulas.org.uk/glenmore-control-panel-refurbishment.md"
excerpt: "[fusion_builder_container type=\"flex\" hundred_percent=\"no\" hundred_percent_height=\"no\" min_height_medium=\"\" min_height_small=\"\" min_height=\"\" hundred_percent_height_scroll=\"no\" align_content=\"stretch\" flex_align_items=\"flex-start\" flex_justify_content=\"flex-start\" flex_wrap_medium=\"\" flex_wrap_small=\"\" flex_wrap=\"wrap\" flex_column_spacing=\"20px\" hundred_percent_height_center_content=\"yes\" equal_height_columns=\"yes\" container_tag=\"div\" menu_anchor=\"\" hide_on_mobile=\"small-visibility,medium-visibility,large-visibility\" status=\"published\" publish_date=\"\" class=\"\" id=\"\" margin_top_medium=\"\" margin_bottom_medium=\"\" margin_top_small=\"\" margin_bottom_small=\"\" margin_top=\"0px\" margin_bottom=\"0px\" padding_top_medium=\"\" padding_right_medium=\"\" padding_bottom_medium=\"\" padding_left_medium=\"\" padding_top_small=\"\" padding_right_small=\"\" padding_bottom_small=\"\" padding_left_small=\"\" padding_top=\"\" padding_right=\"0px\"..."
taxonomy_category:
  - "Hydro"
---

# Glenmore Control Panel Refurbishment

**Project Overview**

The Glenmore hydro scheme was originally installed in 1936 and retained a large proportion of the original equipment, including the refurbished Gilkes turbine. It is rated at 100kW. The scheme had had some remedial works done over the years but had experienced serious issues with the generator and required a solution to address these issues and modernise the plant, including control panel refurbishment.

**Implementation**

Asbestos survey, upgrade of building services (lights, sockets and consumer unit), design, build and installation of new control cabinet, remote SCADA system, including updgrades to enable better monitoring of generator, and a new power cabinet.

Plant recommissoned and further recommendations including safe downstream transport for brown trout. In addition to replacing both intakes, Dulas’ refurbishment works includes replacing the entire pipeline air valves and installing suitable free venting air valves. These improvements ensure that the pipeline operates at full capacity and is protected against catastrophic failure.

By [Dulas Group](https://dulas.org.uk/author/dulas/)
Published On: September 30, 2020

Share:

[https://www.facebook.com/sharer.php?u=https%3A%2F%2Fdulas.org.uk%2Fglenmore-control-panel-refurbishment%2F&t=Share%3A](https://www.facebook.com/sharer.php?u=https%3A%2F%2Fdulas.org.uk%2Fglenmore-control-panel-refurbishment%2F&t=Share%3A)
[https://x.com/intent/post?text=Share%3A&url=https%3A%2F%2Fdulas.org.uk%2Fglenmore-control-panel-refurbishment%2F](https://x.com/intent/post?text=Share%3A&url=https%3A%2F%2Fdulas.org.uk%2Fglenmore-control-panel-refurbishment%2F)
[https://www.linkedin.com/shareArticle?mini=true&url=https%3A%2F%2Fdulas.org.uk%2Fglenmore-control-panel-refurbishment%2F&title=Share%3A&summary=Project%20Overview%0D%0A%0D%0AThe%20Glenmore%20hydro%20scheme%20was%20originally%20installed%20in%201936%20and%20retained%20a%20large%20proportion%20of%20the%20original%20equipment%2C%20including%20the%20refurbished%20Gilkes%20turbine.%20It%20is%20rated%20at%20100kW.%20The%20scheme%20had%20had%20some%20remedial%20works%20done%20over%20the%20years%20but%20had%20experienced%20serious%20issues%20with%20the%20generator%20and%20required%20a%20solution%20to%20address%20these](https://www.linkedin.com/shareArticle?mini=true&url=https%3A%2F%2Fdulas.org.uk%2Fglenmore-control-panel-refurbishment%2F&title=Share%3A&summary=Project%20Overview%0D%0A%0D%0AThe%20Glenmore%20hydro%20scheme%20was%20originally%20installed%20in%201936%20and%20retained%20a%20large%20proportion%20of%20the%20original%20equipment%2C%20including%20the%20refurbished%20Gilkes%20turbine.%20It%20is%20rated%20at%20100kW.%20The%20scheme%20had%20had%20some%20remedial%20works%20done%20over%20the%20years%20but%20had%20experienced%20serious%20issues%20with%20the%20generator%20and%20required%20a%20solution%20to%20address%20these)
[https://api.whatsapp.com/send?text=https%3A%2F%2Fdulas.org.uk%2Fglenmore-control-panel-refurbishment%2F](https://api.whatsapp.com/send?text=https%3A%2F%2Fdulas.org.uk%2Fglenmore-control-panel-refurbishment%2F)
[mailto:?subject=Share%3A&body=https%3A%2F%2Fdulas.org.uk%2Fglenmore-control-panel-refurbishment%2F](mailto:?subject=Share%3A&body=https%3A%2F%2Fdulas.org.uk%2Fglenmore-control-panel-refurbishment%2F)

Strata Florida water treatment works hydroelectric scheme

Strata Florida water treatment works hydroelectric scheme

[Read more](https://dulas.org.uk/strata-florida-water-treatment-works-hydroelectric-scheme/)

Gafr Hydro, Nant Peris

Gafr Hydro, Nant Peris

[Read more](https://dulas.org.uk/gafr-hydro-nant-peris/)

In situ control panel upgrades at hydro scheme

In situ control panel upgrades at hydro scheme

[Read more](https://dulas.org.uk/in-situ-control-panel-upgrades-at-hydro-scheme/)

An 800kW run-of-river hydro scheme near Loch Lomond

An 800kW run-of-river hydro scheme near Loch Lomond

[Read more](https://dulas.org.uk/an-800kw-run-of-river-hydro-scheme-near-loch-lomond/)

Coanda screens in the Himalayas

Coanda screens in the Himalayas

[Read more](https://dulas.org.uk/coanda-screens-in-the-himalayas/)

Fit for the future: Dulas upgrade Dŵr Cymru Welsh Water’s Elan Valley scheme

Fit for the future: Dulas upgrade Dŵr Cymru Welsh Water’s Elan Valley scheme

[Read more](https://dulas.org.uk/elan-valley-upgrade/)

Increasing output through optimisation at the Llyn Brianne hydroelectric plant

Increasing output through optimisation at the Llyn Brianne hydroelectric plant

[Read more](https://dulas.org.uk/increasing-output-through-optimisation-at-the-llyn-brianne-hydroelectric-plant/)

Inverhaggernie intake refurbishment

Inverhaggernie intake refurbishment

[Read more](https://dulas.org.uk/inverhaggernie-intake-refurbishment/)

Atholl Estates Run of River Hydro Scheme

Atholl Estates Run of River Hydro Scheme

[Read more](https://dulas.org.uk/atholl-estates-run-of-river-hydro-scheme/)

Balnacarn Hydro Scheme

Balnacarn Hydro Scheme

[Read more](https://dulas.org.uk/balnacarn-hydro-scheme/)

Iwrch Hydro Scheme Refurbishment

Iwrch Hydro Scheme Refurbishment

[Read more](https://dulas.org.uk/iwrch-hydro-scheme-refurbishment/)

Upper Bryn Cowlyd 200kW new build

Upper Bryn Cowlyd 200kW new build

[Read more](https://dulas.org.uk/upper-bryn-cowlyd-200kw-new-build/)