---
title: "Chillwind Tubular Met Masts"
id: "12"
type: "page"
slug: "chillwind-tubular-met-masts"
published_at: "2025-03-24T11:43:23+00:00"
modified_at: "2025-06-19T11:02:38+00:00"
url: "https://dulas.org.uk/renewables/wind/wind-monitoring/chillwind-tubular-met-masts/"
markdown_url: "https://dulas.org.uk/renewables/wind/wind-monitoring/chillwind-tubular-met-masts.md"
excerpt: "[fusion_builder_container type=\"flex\" hundred_percent=\"yes\" hundred_percent_height=\"min\" min_height_medium=\"\" min_height_small=\"\" min_height=\"365px\" hundred_percent_height_scroll=\"no\" align_content=\"stretch\" flex_align_items=\"center\" flex_justify_content=\"flex-start\" flex_wrap_medium=\"\" flex_wrap_small=\"\" flex_wrap=\"wrap\" flex_column_spacing=\"\" hundred_percent_height_center_content=\"yes\" equal_height_columns=\"no\" container_tag=\"div\" menu_anchor=\"\" hide_on_mobile=\"small-visibility,medium-visibility,large-visibility\" status=\"published\" publish_date=\"\" class=\"\" id=\"\" margin_top_medium=\"\" margin_bottom_medium=\"\" margin_top_small=\"\" margin_bottom_small=\"\" margin_top=\"\" margin_bottom=\"\" padding_top_medium=\"\" padding_right_medium=\"\" padding_bottom_medium=\"\" padding_left_medium=\"\" padding_top_small=\"\" padding_right_small=\"\" padding_bottom_small=\"\" padding_left_small=\"\" padding_top=\"80px\" padding_right=\"7%\"..."
---

Chillwind Tubular Met Masts[dulas2025](https://dulas.org.uk/author/dulas2025/)
2025-06-19T11:02:38+00:00# Chillwind tubular met masts

## Quality tubular masts

Representing rugged Scottish engineering, our tubular met masts are proven to survive the most arduous of on-site conditions, up to a height of 90 metres.

These quality tubular masts are assembled by our specialist team in Inverness. They are customised with data loggers and the highest quality instruments to suit each individual client’s requirements, and hot-dip galvanised to give a lifespan of 20+ years.

Chillwind met masts are renowned for their ability to stand up to the worst conditions – they’ve been airlifted into environments as inhospitable as the Norwegian tundra and installed on stormy offshore islands.

[Make an enquiry](#awb-open-oc__5152)

Features and benefits

Features and benefits

- Up to 90m height, in a single lift installation
- Standardised tubular sections – ease of inspection and convenience of transportation
- Each 6m mast section is section is fabricated using S355J2H Circular Hollow Section (CHS) BS EN 10219-1 and hot dip galvanised in accordance to BS EN ISO1461
- 4-point guy wire and ground anchors, split where necessary
- Ground-based, tilt up installation – no climbing or working at height required
- 20-year warranty on parts and manufacture
- Made in Scotland to Dulas factory standards
- Accurate installation of instruments at your specified heights and orientations

Technical specifications

Technical specifications

- Available at a range of heights 10m-90m
- Typically 6 measurements heights per tower
- Assembly and instrumentation conform to standards outlined in IEC 61400-12-1:2017 and ISO 17713-1

Wind monitoring case studies

[See all case studies](https://dulas.org.uk/news/case-studies/)

Dulas supports landmark wind farm planning in Wales

[Read more](https://dulas.org.uk/dulas-supports-landmark-wind-farm-planning-in-wales/)

From planning to decom: Wind monitoring at a site in Wales

[Read more](https://dulas.org.uk/from-planning-to-decom-wind-monitoring-at-a-site-in-wales/)

Dulas installs first-ever flux tower in the South of Scotland

[Read more](https://dulas.org.uk/dulas-installs-first-ever-flux-tower-in-the-south-of-scotland/)

London Array Wind Farm Wind Monitoring Instrumentation

[Read more](https://dulas.org.uk/london-array-wind-farm-wind-monitoring-instrumentation/)

Y Bryn Wind Farm Met mast installation

[Read more](https://dulas.org.uk/case-study-y-bryn-windfarm/)

Grayside Wind Farm LiDAR Installation

[Read more](https://dulas.org.uk/case-study-grayside-wind-farm/)

Gordonbush Wind Farm Permanent WindCube Installation

[Read more](https://dulas.org.uk/case-study-gordonbush-wind-farm/)

Golticlay, Caithness – Mast refurbishment

[Read more](https://dulas.org.uk/golticlay-caithness-mast-refurbishment/)

Onshore wind feasibility

[Read more](https://dulas.org.uk/onshore-wind-feasibility/)

Beinn Mhor and Rothmaise

[Read more](https://dulas.org.uk/beinn-mhor-and-rothmaise/)

Clocaenog Forest Met Mast Refurbishment

[Read more](https://dulas.org.uk/clocaenog-forest-met-mast-refurbishment/)

Nant y Gelli Wind Turbine Feasibility Study and Planning Services

[Read more](https://dulas.org.uk/nant-y-gelli-wind-turbine-feasibility-study-and-planning-services/)

Ty Nant Single Turbine Environmental Report and Planning application

[Read more](https://dulas.org.uk/ty-nant-single-engine-turbine-report/)

[See all case studies](https://dulas.org.uk/news/case-studies/)

Need more information?

Get in touch with our dedicated sales team today

[Make an enquiry](#awb-open-oc__5152)
