Client – Lochdochart Estate
Project Overview
Implementation
Technical Overview | |
---|---|
Power Output | 700 kW |
Intakes | 4 x Aquashear Coanda screens type C |
Turbine | Canyon twin jet |
Generator | AVK Synchronous |
PLC Code | Dulas |
Inverhaggernie HEP 3 km northwest of Crianlarich was built with a side intake, which since construction, suffered blocking from vegetation that significantly reduced production and consumed a large number of man hours in trips to clean the intake. Dulas had previously done work for the scheme owner, upgrading the control panel by fitting a SCADA for improved monitoring, data logging, remote access/communication, installing new PLC Code and recommissioning the plant.
Dulas was contracted to carry out the design and consenting of a new intake with AquaShear Coanda intake screens and to act as the Client’s Engineer during the construction phase. The scope of the works included the construction of a completely new intake, connection to the existing pipe, excavating the existing air valves and replacing them plus the repair of an exposed leak in the pipeline at the HPPE/ductile iron interface.
Technical Overview | |
---|---|
Power Output | 700 kW |
Intakes | 4 x Aquashear Coanda screens type C |
Turbine | Canyon twin jet |
Generator | AVK Synchronous |
PLC Code | Dulas |
Unit 1 Dyfi Eco Park
Machynlleth
Powys
SY20 8AX
Wales, UK
Send us details of your next scheme to receive tailored advice and recommendations.
Subscribe to our Renewables newsletter
© 2024 Dulas Ltd. All rights reserved. | Registered in Wales. No. 1629011 | VAT No. GB 377 7317 15
Dulas Ltd, Unit 1 Dyfi Eco Park, Machynlleth, Powys, SY20 8AX. | Privacy Policy